Project Description
With the desire to improve productivity, reduce construction costs for the loading and unloading of bulk cargo at the wharf. From the above idea, Vina Logistics Joint Stock Company ordered us to design and construct a transshipment system to optimize the loading and unloading of bulk goods from the container to the ship.
In this project, Amecc South assumes the role from design to construction, procurement, installation and commissioning.
This is the first product of Amecc South company. Despite facing many difficulties, but with a team of engineers with many years of experience and dedication, we completed the project within 3 months from design to construction, installation, commissioning and commissioning.
The product is also the first product in Vietnam in this field, marking a step in the development of the freight industry towards greater specialization.