Project Description

In the Consortium with Ba Son Cooperation and SRE Company, Amecc South jointed in the project of fabrication of seafastening structure for Hai Long Windfarm project.

  • Total fabrication weight: Over 1,600 MT
  • Fabrication duration: August 2023 to Early of March 2024
  • Fabrication location: Phu My, Ba Ria Vung Tau provine
  • Scope: Supply Project management team (PM, CM, Superintendent, QAQC manager, HSE manager, Lifting manager), detail design, fabrication, installation, trial test and acceptance.