Fabrication of Seafastening Structure – Fengmiao 1 Project
Gallery

Fabrication of Seafastening Structure – Fengmiao 1 Project

Fabrication of Seafastening Structure – Fengmiao 1 Project

In consortium with Ba Son Corporation and SRE Company, Titantech Energy Joint Stock Company participated in the fabrication of seafastening structures for the Fengmiao 1 Offshore Wind Project for Client CDWE with the application:

uyennh@titantech.com.vn2025-10-10T22:31:15+07:00
Conductor Pipe Fabrication
Gallery

Conductor Pipe Fabrication

Conductor Pipe Fabrication

Titantech successfully completed the Conductor Pipe Fabrication Project for NOV, under the Block 12/11 EB-1X drilling program.The project involved the fabrication of 350 tons of conductor pipes, ensuring high-quality welding, dimensional accuracy, and timely

uyennh@titantech.com.vn2025-10-10T22:57:12+07:00
Reparation the Rig PVD VIII’s Spudcan Tips
Gallery

Reparation the Rig PVD VIII’s Spudcan Tips

Reparation the Rig PVD VIII’s Spudcan Tips

TitanTech successfully executed the Reparation of PV Drilling VIII’s Spudcan Tips Project for PetroVietnam Drilling & Well Service Corporation (PVDD) at PTSC Supply Base Jetty.The project involved the inspection, repair, and reinforcement of spudcan

uyennh@titantech.com.vn2025-10-10T21:44:45+07:00
Provision of Jackets fabrication service – Block B Gas Project
Gallery

Provision of Jackets fabrication service – Block B Gas Project

Provision of Jackets fabrication service – Block B Gas Project

Titantech is proud to participate in the Block B - Ô Môn project, providing fabrication and construction services. In this project, Titantech has been entrusted with the fabrication of two jackets, KLWB and AQWA,

portal portal2026-06-13T11:35:12+07:00
Long Son Petrochemicals Project
Gallery

Long Son Petrochemicals Project

Long Son Petrochemicals Project

Titantech Energy provided operational support services for Long Son Petrochemicals, contributing to the stable and safe operation of one of Vietnam’s largest petrochemical complexes. Project Highlights Client: Long Son Petrochemicals (LSP) Contract Value: USD

portal portal2026-06-13T11:34:33+07:00
Long Son Petrochemicals Factory Project
Gallery

Long Son Petrochemicals Factory Project

Long Son Petrochemicals Factory Project

Titantech Energy was entrusted by TPSK to provide maintenance services for the Long Son Petrochemicals Factory (LSP). Over a 27-month period, Titantech mobilized and managed a workforce of up to 300 personnel, contributing to

uyennh@titantech.com.vn2024-12-06T22:45:35+07:00
Installation of CO2 Chiller System in 2024 – Client: PVC FC
Gallery

Installation of CO2 Chiller System in 2024 – Client: PVC FC

Installation of CO2 Chiller System in 2024 – Client: PVC FC

Project: Installation of CO2 Chiller System Client: PetroVietnam Camau Fertilizer Joint Stock Company (PVC FC) Scope of work: Providing repair and maintenance services for rotating equipment in Camau Fertilizer Factory.

uyennh@titantech.com.vn2024-12-24T14:48:48+07:00
Kình Ngư Trắng – Kình Trắng Nam Project
Gallery

Kình Ngư Trắng – Kình Trắng Nam Project

Kình Ngư Trắng – Kình Trắng Nam Project

From March 2024, Amecc South has been participating in the White Whale – White Whale South project with the following commitments: Estimated total workload: 1,500 tons Estimated construction timeline: 11 months Scope of work:

uyennh@titantech.com.vn2026-06-13T11:11:43+07:00
Fabrication of seafastening structure for Hai Long windfarm project
Gallery

Fabrication of seafastening structure for Hai Long windfarm project

Fabrication of seafastening structure for Hai Long windfarm project

In the Consortium with Ba Son Cooperation and SRE Company, Amecc South jointed in the project of fabrication of seafastening structure for Hai Long Windfarm project. Total fabrication weight: Over 1,600 MT Fabrication duration:

uyennh@titantech.com.vn2024-12-06T22:24:10+07:00
Wind tower installation project
Gallery

Wind tower installation project

Wind tower installation project

From July 2021 to October 2021, Amecc South undertakes the entire process of installing the super-heavy-sized turbines with modern equipment and facilities with highly skilled and professional workers for 02 windfarm projects: 1/ PHONG

uyennh@titantech.com.vn2026-06-13T11:41:41+07:00
Wartsila Project – Replacement of scrubbers of ship
Gallery

Wartsila Project – Replacement of scrubbers of ship

Wartsila Project – Replacement of scrubbers of ship

According to IMO 2020 regulations of the International Maritime Organization, the reduction of sulfur content in fuel oil of ships applied globally will be reduced to 0.5% from 01/Jan /2020. In order to support

uyennh@titantech.com.vn2024-12-07T17:52:35+07:00
Container Flipping Rack Project
Gallery

Container Flipping Rack Project

Container Flipping Rack Project

With the desire to improve productivity, reduce construction costs for the loading and unloading of bulk cargo at the wharf. From the above idea, Vina Logistics Joint Stock Company ordered us to design and

uyennh@titantech.com.vn2026-06-13T11:42:03+07:00
Fabrication, installation of piping system for Hoa Phat steel plant
Gallery

Fabrication, installation of piping system for Hoa Phat steel plant

Fabrication, installation of piping system for Hoa Phat steel plant

The Project of Fabrication, installation of piping system for Hoa Phat steel plant – completed in May 2019.

uyennh@titantech.com.vn2024-12-06T22:25:55+07:00
Maintenance of anchor winches and motors on oil rig Murmanskaya
Gallery

Maintenance of anchor winches and motors on oil rig Murmanskaya

Maintenance of anchor winches and motors on oil rig Murmanskaya

The Project of maintenance of anchor winches and motors on oil rig Murmanskaya … – completed in January 2019.

uyennh@titantech.com.vn2024-12-07T17:54:17+07:00
The project of repair and maintenance for the ship Semen completed in February 2020
Gallery

The project of repair and maintenance for the ship Semen completed in February 2020

The project of repair and maintenance for the ship Semen completed in February 2020

Semen Dezhnev is a ship with a hull of 100 m long and 94 m wide, DWT 4819 tons, built in Russia. Thanks to the previous experience in construction of many large projects, Amecc South

portal portal2026-06-13T11:55:41+07:00
Newbuilding pirate ship project
Gallery

Newbuilding pirate ship project

Newbuilding pirate ship project

Amecc South participated in the design, procurement, fabrication and loadout of a themed restaurant vessel developed for Novaland Group, combining marine engineering expertise with architectural and hospitality requirements. Project Highlights - Client: Novaland Group

  • TITANTECH ENERGY JOINT STOCK COMPANY
  • 3rd floor, Hodeco Plaza Building, No 36, Nguyen Thai Hoc Street, Tam Thang Ward, Ho Chi Minh City, Vietnam

  • TITANTECH ENERGY FACTORY

  • An Ngai Industrial Cluster, Long Dien Commune, Ho Chi Minh City, Vietnam

  • Total square: 16,631.2 m2

  • SUBSIDIARY:

    TITAN COATING SERVICE JOINT STOCK COMPANY

  • Ba Son Shipyard, Phu My II I.Z, Phu My Ward, Ho Chi Minh City, Vietnam

INQUIRY FORM
SEND MAIL
Facebook
ZALO HELPDESK
Page load link
Go to Top